Project Scheduling in Uncertain Environments: An IntuitionisticFuzzy Approach to solve CPM

Authors

  • Soumyarani Pati Department of Mathematics Rajendra University, Balangir, 767002, Odisha, India. Author
  • Kshitish Kumar Mohanta Department of Mathematics Rajendra University, Balangir, 767002, Odisha, India. Author https://orcid.org/0000-0003-2681-4785

DOI:

https://doi.org/10.31181/sa32202548

Keywords:

Intuitinistic fuzzy set, Project scheduling, Triangular intuitionistic fuzzy number, Critical Path method

Abstract

 The Critical Path Method (CPM) in a fuzzy context is an important tool for dealing with uncertain, perhaps vague, project scheduling. This paper presents two new solution method for the Intuitionistic Fuzzy Critical Path Method (IFCPM) by defining activity durations using Triangular Intuitionistic Fuzzy Numbers (TIFNs). These methods combine forward pass and backward pass calculations, to identify the earliest and latest event times and computes, the total float for each activity. This method improves project scheduling by dealing with uncertainty and hesitancy for activity duration. To demonstrate the practical utility and usefulness of the method, two numerical examples are considered to prove it can identify the critical path in an intuitionistic fuzzy environment. The results demonstrate that the method described here improves the robustness and flexibility of the project scheduling process under uncertainty. 

References

L. A. Zadeh, “Fuzzy sets,” Information and control, vol. 8, no. 3, pp. 338–353, 1965.

G. Klir and B. Yuan, Fuzzy sets and fuzzy logic, vol. 4. Prentice hall New Jersey, 1995.

K. T. Atanassov, “Intuitionistic fuzzy sets,” Fuzzy Sets and Systems, vol. 20, no. 1, pp. 87–96, 1986.

R. R. Yager, “Uncertainty modeling using fuzzy measures,” Knowledge-Based Systems, vol. 92, pp. 1–8, 2016.

Z. Xu, “Intuitionistic preference relations and their application in group decision making,” Information sciences, vol. 177,

no. 11, pp. 2363–2379, 2007.

K. K. Mohanta and D. S. Sharanappa, “A novel technique for solving intuitionistic fuzzy dea model: an application in indian

agriculture sector,” Management System Engineering, vol. 2, no. 1, p. 12, 2023.

V. Chaubey, D. S. Sharanappa, K. K. Mohanta, and R. Verma, “A malmquist fuzzy data envelopment analysis model for

performance evaluation of rural healthcare systems,” Healthcare Analytics, vol. 6, p. 100357, 2024.

K. K. Mohanta, D. S. Sharanappa, D. Dabke, L. N. Mishra, and V. N. Mishra, “Data envelopment analysis on the context of

spherical fuzzy inputs and outputs,” European journal of pure and applied mathematics, vol. 15, no. 3, pp. 1158–1179, 2022.

K. U. Madhuri, S. Siresha, and N. R. Shankar, “A new approach for solving fuzzy critical path problem using ll fuzzy numbers,”

Applied Mathematical Sciences, vol. 6, no. 27, pp. 1303–1324, 2012.

N. R. Shankar, V. Sireesha, K. S. Rao, and N. Vani, “Fuzzy critical path method based on metric distance ranking of fuzzy

numbers,” International Journal of Mathematical Analysis, vol. 4, no. 20, pp. 995–1006, 2010.

H. A. E.-W. Khalifa, M. G. Alharbi, and P. Kumar, “On determining the critical path of activity network with normalized

heptagonal fuzzy data,” Wireless Communications and Mobile Computing, vol. 2021, no. 1, p. 6699403, 2021.

P. P. Bushan Rao and N. Ravi Shankar, “Fuzzy critical path analysis based on centroid of centroids of fuzzy numbers and new

subtraction method,” International Journal of Mathematics in operational research, vol. 5, no. 2, pp. 205–224, 2013.

A. H. Ganesh and A. H. Shobana, “On optimizing interval data based critical path problem for the analysis of various fuzzy

quantities using fuzzification and centroid based defuzzification techniques,” Mat. S (1), pp. 319–330, 2020.

A. Kumar and P. Kaur, “A new approach for fuzzy critical path analysis,” International Journal of Mathematics in Operational

Research, vol. 3, no. 3, pp. 341–357, 2011.

S. Narayanamoorthy and S. Maheswari, “The intelligence of octagonal fuzzy number to determine the fuzzy critical path: A

new ranking method,” Scientific Programming, vol. 2016, no. 1, p. 6158208, 2016.

M. Gül, A. F. Güneri, and G. Güneş, “Project management in healthcare: A case study for patient flow evaluation in an

emergency room using fuzzy cpm and fuzzy pert,” Sigma, vol. 8, no. 1, pp. 41–51, 2017.

D. Castro-Lacouture, G. A. Süer, J. Gonzalez-Joaqui, and J. Yates, “Construction project scheduling with time, cost, and

material restrictions using fuzzy mathematical models and critical path method,” Journal of Construction Engineering and

Management, vol. 135, no. 10, pp. 1096–1104, 2009.

M. Oladeinde and D. Itsisor, “Application of fuzzy theory to project scheduling with critical path method,” Journal of Applied

Sciences and Environmental Management, vol. 17, no. 1, pp. 161–166, 2013.

D. Sen, D. Roy, and S. Dey, “Critical path method in the network analysis with parametric fuzzy activity,” a a, vol. 1, no. 2,

p. 3, 2019.

M. Kiruthiga and T. Hemalatha, “Intuitionistic fuzzy technique to find the critical path,” International Journal of Statistics

and Applied Mathematics, 4 (3), pp. 39–42, 2019.

N. Rameshan and D. S. Dinagar, “A method for finding critical path with symmetric octagonal intuitionistic fuzzy numbers,”

Advances in Mathematics: Scientific Journal, vol. 9, no. 11, pp. 9273–9286, 2020.

R. S. Porchelvi and G. Sudha, “Critical path analysis in a project network using ranking method in intuitionistic fuzzy

environment,” Int. J. Adv. Res, vol. 3, pp. 14–20, 2015.

G. Sudha, R. Porchelvi, and K. Gnanaselvi, “Solving critical path problem using triangular intuitionistic fuzzy number,”

International Journal of Fuzzy Mathematical Archive, vol. 14, no. 1, pp. 1–8, 2017.

T.-C. Han, C.-C. Chung, and G.-S. Liang, “Application of fuzzy critical path method to airports cargo ground operation

systems,” Journal of Marine Science and Technology, vol. 14, no. 3, p. 2, 2006.

T. Yogashanthi, S. Sathish, and K. Ganesan, “A study on intuitionistic fuzzy critical path problems through centroid based

ranking method,” Math. Stat., vol. 10, no. 6, pp. 1326–1333, 2022.

P. Jayagowri and G. Geetharamani, “A critical path problem using intuitionistic triangular fuzzy number,” International

Journal of Engineering Research and Applications, vol. 4, no. 5, pp. 55–60, 2014.

R. Shaik and N. R. Shankar, “Ranking method and graphical method to find the critical path of a fuzzy project network with

trapezoidal intuitionistic fuzzy numbers as activities,” Tuijin Jishu/Journal of Propulsion Technology, vol. 45, no. 1, p. 2024.

P. Kaur and A. Kumar, “A new ranking approach and its application to solving fuzzy critical path problems,” South African

Journal of Industrial Engineering, vol. 23, no. 3, pp. 91–102, 2012.

Published

2025-06-14

How to Cite

Soumyarani Pati, & Mohanta, K. K. (2025). Project Scheduling in Uncertain Environments: An IntuitionisticFuzzy Approach to solve CPM. Systemic Analytics, 3(2), 118-134. https://doi.org/10.31181/sa32202548