[1]
F. Z. Montazeri and M. . Daneshmand-Mehr, “A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling with Uncertain Inter-Factory Transportation Times”, Syst. Anal., vol. 4, no. 3, pp. 193–207, Sep. 2026, doi: 10.31181/sa202586.