Montazeri, F.Z. and Daneshmand-Mehr, M. (2026) “A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling with Uncertain Inter-Factory Transportation Times”, Systemic Analytics, 4(3), pp. 193–207. doi:10.31181/sa202586.