Montazeri, F. Z., & Daneshmand-Mehr, M. . (2026). A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling with Uncertain Inter-Factory Transportation Times. Systemic Analytics, 4(3), 193-207. https://doi.org/10.31181/sa202586