1.
Montazeri FZ, Daneshmand-Mehr M. A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling with Uncertain Inter-Factory Transportation Times. Syst. Anal. 2026;4(3):193-207. doi:10.31181/sa202586