(1)
Montazeri, F. Z.; Daneshmand-Mehr, M. . A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling With Uncertain Inter-Factory Transportation Times. Syst. Anal. 2026, 4 (3), 193-207. https://doi.org/10.31181/sa202586.