[1]
Montazeri, F.Z. and Daneshmand-Mehr, M. 2026. A Robust Iterated Greedy Algorithm for Distributed Flow Shop Scheduling with Uncertain Inter-Factory Transportation Times. Systemic Analytics. 4, 3 (Sep. 2026), 193–207. DOI:https://doi.org/10.31181/sa202586.